HOME ABOUT US ENVIRONMENTAL
IMPACT
THE FACTS EMIRATES KNOWLEDGE
BASE
contact us glossary legal
  KNOWLEDGE BASE  
  search results
  Case Study
1-3 of 3 1  >
 
Courtyard on Bear and Cave Avenue Housing
 
Client/developer:
Architect:
Architect:
Structural Engineer:
Materials Engineer:
Contractor:
Concrete Supplier:
Architect:
Contractor:
Arctos & Bird Enterprises
Zeidler Carruthers & Associates Architects
William McDonough + Partners
Read Jones Christoffersen Ltd
McIntosh Lalani Engineering Ltd.
PCL-Maxam, A Joint Venture
Lafarge Canada Inc.
IBI Group
Rescom Inc.

  1 Appendix A: Sample Concrete Test Results [Courtyard on Bear and Cave Avenue Housing Projects]
    Document Type: Case Study Report
    Publication Date: February 2005
Author(s): McIntosh Lalani Engineering Ltd.
    Sample concrete test reports for the Courtyard on Bear and Cave Avenue Housing projects, Banff, AB....[more]
    See Also: concrete tests
  2 Courtyard on Bear and Cave Avenue Housing - Banff, AB Case Study: End of Construction Follow-up Report
    Document Type: Case Study Report
    Publication Date: February 2005
Author(s): Kristy Neish, E.I.T., Read Jones Christoffersen Ltd
    This follow up study documents the concrete test results for the Courtyard on Bear project, Banff, AB. The study should be read in conjunction with the original project report for the Courtyard on Bear and Cave Avenue Housing Project, completed in March 2004.

Although similar testing was done on both the Courtyard on Bear and the Cave Avenue...[more]

    See Also: concrete tests, strength development, stripping time
  3 Courtyard on Bear and Cave Avenue Housing - Banff, AB Case Study: Using EcoSmart Concrete in Cold Weather Construction
    Document Type: Case Study Report
    Publication Date: March 31, 2004
Author(s): Kristy Neish, E.I.T., Read Jones Christoffersen Ltd
    This study reports the challenges encountered using EcoSmart concrete during cold weather construction in Banff, Alberta, and provides possible solutions to these challenges. Although construction was initially planned to begin in summer, an increased design period and delays in the permitting process pushed the construction schedules for both proj...[more]
    See Also: accelerating admixtures, cold weather concreting, mixture proportioning, strength development, stripping time, superplasticizers
   
1-3 of 3 1  >
filter results
Document type:
All Case Study Report
Image Presentation
Technical Report Website
Rank results by audience group:
no ranking developers
architects engineers
contractors suppliers
search
search again
Search By:
Keywords:
From:
To:
search
browse by subject
browse by case study
A Concrete Contribution to the Environment © 2004-2010 EcoSmart™ Foundation